Project Profile

Strider Solar Farm

28

Jobs Created

38,503

Homes' annual electricity usage eliminated

49,114

Passenger cars removed from the road annually

25,587,726

Gallons of gasoline reduced in consumption

29,004,862,800

Cell phones charged

This project has a capacity of 7 MW with a projected abatement of 223,355 MT CO2e over its expected 40-year operating life.

Strider Solar Farm has generated clean energy since it was established in 2017. The Strider Solar Farm is located in Randolph County, North Carolina. The solar installation’s 7 MWdc of renewable energy positively impacts its community by reducing the number of harmful pollutants released into the environment, decreasing dependency on the electricity grid and stimulating the local economy through new job opportunities and stabilized energy costs for residents. Through the solar Investment Tax Credit (ITC), Strider Solar Farm brings lasting benefits to its local community, fostering a more sustainable future for the area for years to come.

Project Type:
Renewable Energy
Tax Credit Type:
Federal
Address:

1925 Archie Newsom Road
Asheboro, North Carolina 27205

Contact us for more information about impact investing, federal and state tax credits.